|
Tiles, shower, basin, hot water tank on the way out |
I wasn't on site today but Tom went up as the Building Control had another visit scheduled to inspect all the timber connections, insulation plans and steels. Everything was signed off fine and they won't be back until all the work is done for a final check. Tom sent me two photos of the first floor bathroom which was completely stripped out today, including the hot water tank, shower and dividing walls. They don't hang about!
|
This will be a utility room and WC once it's finished |
No comments:
Post a Comment