Day 19 - Start of Week 4


Looking at the timbered loft space from the end of the terrace

Time has flown by and we're now at the start of week four of the building works. I was working in London yesterday and dropped in just before the guys left to have a look at progress. The loft space is now completely enclosed by the roof timbers (although they are open).

The first of the joists above my bedroom
Today I also was also on site after lunch and the guys have started putting in the timber joists in my bedroom ceiling. Also the stud wall between the kitchen and living room has been taken out so you can see the whole space. It's going to be a lovely large room with masses of room for a fairly large kitchen table.