Friday, 10 May 2013

Day 58 - More Plastering and Rendering

Rendered Terrace Wall
The remaining windows were supposed to arrive today. However I received a call from the delivery driver around lunchtime saying that he had been involved in an accident and they wouldn't be delivered today. They are already late and this is holding up the plastering as well as the scaffolding which is a bit of a problem. (The driver said he was fine by the way, and I'm uncharitably thinking that he wanted to start his weekend a bit early and was making excuses!).

The rendering along the terrace wall looks very sharp and more plastering has been done in the loft. Also the bathroom items were delivered today along with some of the doors, and the shower tray is already in position. I think we're going to see a big transformation this week with lots happening.
The loft bedroom is nearly completely plastered